  • Entrance roadway and curved canopy of the San Francisco International Airport terminal

    Aviation & Transportation

    San Francisco, CA

    San Francisco International Terminal

    International airport terminal program — $2B project

    On the $2 billion San Francisco International Terminal project, Mr. Coe served as Deputy Chief Estimator for the on-site construction management team — estimating and negotiating over a thousand change orders of more than $100 million, and reviewing over two hundred change orders with savings for the airport of over $20 million.

    Role

    Deputy Chief Estimator, on-site construction management team (representing M. Lee/Lee Saylor Joint Venture with SFOA Joint Venture Partners)

    • Estimated and negotiated over one thousand change orders totaling more than $100M
    • Reviewed over two hundred change orders with savings for the airport of over $20M
    • Lead negotiator on mechanical, electrical, plumbing, and drywall change orders
    • CMA on the fifth-floor Police Station, Airport Museum, Terminal H, parking structures, and International Terminal
    Construction ManagementCost & Damage AnalysisMechanicalElectricalPlumbing
  • Oakland skyline and Bay Bridge viewed from the waterfront

    Aviation & Transportation

    Oakland, CA

    Port of Oakland — Phase 1A Expansion

    Port expansion project — $50M

    As Senior Project Controls Specialist and Cost Consultant on the Port of Oakland's Phase 1A expansion, Mr. Coe successfully negotiated more than fifty-six changes, with savings of over $1.8 million. He also served as CMA and expert defense witness on a construction claim on the Port Expansion Project.

    Role

    Senior Project Controls Specialist and Cost Consultant (representing Parsons CMT) on the Phase 1A expansion; CMA and expert defense witness on a construction claim on the Port Expansion Project

    • Negotiated over fifty-six changes with savings of over $1.8M
    • Construction claim support on the Port Expansion Project as CMA and expert defense witness
    Construction ManagementClaims & LitigationCost & Damage Analysis
  • Entrance sign at Lawrence Livermore National Laboratory with rock landscaping

    Laboratories & Research

    Livermore, CA

    Lawrence Livermore National Laboratory

    National laboratory campus — research, laboratory, and support facilities

    From 2000 to 2005, as Special Projects Senior Construction Planner/Estimator, Mr. Coe supported estimating, change order management, inspections, and seismic upgrade planning across the national laboratory campus — including the $66 million Terrascale Simulator Facility and $100 million in seismic retrofits.

    Role

    Special Projects Senior Construction Planner/Estimator (Johnson Controls master vendor subcontract, 2000–2005); earlier CMA and inspection support on over thirty-one projects

    • Terrascale Simulator Facility, $66M — CMA oversight, change order management, and specialty inspection coordination
    • Reviewed all outside budget estimates on $120M of Title I and II projects
    • Senior Planner for ten new 20,000 SF buildings — over $30M in construction
    • Seismic retrofits for twenty buildings — $100M CMA/planning role
    MechanicalElectricalPlumbingConstruction ManagementCost & Damage Analysis
  • Research laboratory interior with technical equipment and workstations

    Laboratories & Research

    Livermore, CA

    National Ignition Facility

    $1B laser research facility — laser and capacitor bays

    On the $1 billion National Ignition Facility, Mr. Coe designed seismic support systems for $10 million of electrical subcontract work, supervised a four-person seismic design team, and served as QA/QC Manager, supervising the high-voltage cable installation crew.

    Role

    Electrical Project Engineer / QA-QC Manager for Collins Electric (1997–1999)

    • Designed seismic conduit and equipment support matrix systems for $10M of electrical subcontracts
    • Managed outside structural and electrical engineering support
    • Coordinated underground and overhead conduit routing with mechanical utilities
    • Supervised the high-voltage cable installation crew and a three-person equipment inspection team
    Electrical
  • Telecommunications & Mission-Critical

    Pleasanton, CA

    AT&T Western Regional Center

    1.1 million SF facility

    At AT&T's 1.1 million square foot Western Regional Center, Mr. Coe served as CMA responsible for submittal review, RFI responses, and architect and engineer coordination with the owner on final design issues and project closeout.

    Role

    Construction Management Advisor for Rosewood Associates (joint venture of Prudential Insurance and AT&T)

    • Submittal review, RFI responses, and architect/engineer coordination
    • Coordination with the owner on final design issues and project closeout
    • Daily meetings with subcontractor supervisors and construction management staff
    MechanicalElectricalConstruction Management
  • Laboratories & Research

    San Jose, CA

    IBM Almaden Research Center

    1.2 million SF facility

    At IBM's 1.2 million square foot Almaden facility, Mr. Coe represented the architect in change order negotiations, submittal review, daily building inspections, and punch list signoff.

    Role

    A/E representative for MBT Architects

    • Change order review and negotiations
    • Submittal review and RFI responses
    • Daily building inspections and punch list development
    • Supervised in-house electrical engineer for plan review and bulletin revisions
    ElectricalMechanical
  • Aviation & Transportation

    San Francisco Peninsula, CA

    Caltrain Positive Train Control Project

    $200M rail safety control project

    Caltrain's $200 million Positive Train Control Project — one of the major projects in the Coe & Company Construction Services portfolio.

    Role

    Major project, Coe & Company Construction Services

  • Curved glass and steel facade of the Cathedral of Christ the Light in Oakland

    Public & Municipal

    Oakland, CA

    Cathedral of Christ the Light

    $290M cathedral project

    Oakland's $290 million Cathedral of Christ the Light — one of the major projects in the Coe & Company Construction Services portfolio.

    Role

    Major project, Coe & Company Construction Services

  • Aviation & Transportation

    San Francisco, CA

    San Francisco 3rd Street Light Rail

    Light rail program — Sections B, F, and H

    CMA support on Sections B, F, and H of San Francisco's 3rd Street Light Rail, part of Mr. Coe's work with M Lee and Associates — $2 billion in cumulative construction value.

    Role

    CMA support with M Lee and Associates

    Construction Management
  • Public & Municipal

    San Francisco, CA

    San Francisco Jail #3

    Detention facility

    CMA support on the San Francisco Jail #3 project, part of Mr. Coe's work with M Lee and Associates.

    Role

    CMA support with M Lee and Associates

    Construction Management
  • Aviation & Transportation

    San Francisco Bay Area, CA

    BART Projects

    Transit district facilities — three projects

    CMA support on three Bay Area Rapid Transit (BART) projects, part of Mr. Coe's work with M Lee and Associates.

    Role

    CMA support with M Lee and Associates

    Construction Management
  • Aviation & Transportation

    Los Angeles, CA

    Tom Bradley International Terminal Expansion

    International airport terminal expansion

    CMA support on the Tom Bradley International Terminal expansion at Los Angeles International Airport, part of Mr. Coe's work with M Lee and Associates.

    Role

    CMA support with M Lee and Associates

    Construction Management
  • Hospitality & Entertainment

    Lake Tahoe, NV

    Hard Rock Casino at Lake Tahoe

    $22M casino project

    The $22 million Hard Rock Casino project at Lake Tahoe — one of the major projects in the Coe & Company Construction Services portfolio.

    Role

    Major project, Coe & Company Construction Services

  • Wine barrel cave lined with racked oak barrels at a California winery

    Industrial

    Sonoma County, CA

    Francis Ford Coppola Winery Expansion

    $25M winery expansion projects

    Francis Ford Coppola Winery expansion projects totaling $25 million — one of many winery and food-processing projects in Mr. Coe's career.

    Role

    Major project, Coe & Company Construction Services

  • Industrial

    Sonoma County, CA

    Lynmar Winery Expansion Claims

    Winery production area and tasting room — $7M

    Expansion claims for production area and tasting room defects at Lynmar Winery — $7 million.

    Role

    Expansion claims for production area and tasting room defects

    Claims & Litigation
  • Hospitality & Entertainment

    Carmel-by-the-Sea, CA

    Golden Bough Playhouse Renovation

    $7M theater renovation

    Construction management advisory services for the owners on the $7 million renovation of the Golden Bough Playhouse — design development, contract administration, demolition, bidding, and supervision.

    Role

    Construction Management Advisor for the owners

    • Design development and contract administration
    • Demolition and bidding
    • Supervision on behalf of the owners
    Construction Management
  • Hospitality & Entertainment

    San Francisco, CA

    San Francisco Marriott Hotel

    Hotel

    Change order review services on San Francisco Marriott Hotel construction work.

    Role

    Change order review

    Cost & Damage Analysis
  • Public & Municipal

    San Francisco, CA

    San Francisco Housing Authority Projects

    Public housing facilities

    CMA support on San Francisco Housing Authority projects, part of Mr. Coe's work with M Lee and Associates.

    Role

    CMA support with M Lee and Associates

    Construction Management
  • Aviation & Transportation

    San Francisco, CA

    SFO Airport Waste Treatment Plant

    Airport waste treatment plant

    Construction management advisory support and initial budget estimating for the San Francisco Airport Waste Treatment Plant.

    Role

    CMA support and initial budget estimate

    Construction ManagementCost & Damage Analysis
  • Multi-story shingle-clad condominium complex of the type involved in defect litigation

    Multi-Family & Residential

    California & Nevada

    Residential Construction Defect Litigation

    Custom homes, condominiums, apartments, and subdivisions

    Mr. Coe has participated in litigation on more than 470 residential homes. His residential work extends from custom home defect cases up to $30 million to high-rise condominiums and expert witness support on single-family housing of more than 3,000 homes — covering MEPF systems, building envelopes, and standard-of-care questions.

    Role

    Designated expert and consultant — plaintiff and defense

    • Cumulative participation in litigation on over 470 residential homes
    • Custom home defect cases up to $30M in Northern California
    • High-rise (over six stories) and low-rise housing matters
    • Expert witness support on single-family housing — 3,000+ homes
    MechanicalElectricalPlumbingFire ProtectionBuilding EnvelopeClaims & Litigation
  • Tree-lined walkway through a California university campus

    Universities & Education

    California

    Educational Facilities & School Districts

    K-12 campuses, gymnasiums, science buildings, and district facilities

    School facility work spans decades of Mr. Coe's career — from foreman on new school construction and campus high-voltage distribution to forensic work on electrical control and power systems at multiple California districts and a high school HVAC matter.

    Role

    Forensic consultant and expert — control systems, power, and HVAC

    • Electrical control and power systems evaluated for school facilities at multiple California districts
    • Defense mechanical expert on a high school construction matter with HVAC system claims
    • Foreman for new school construction — gymnasiums, portables, science buildings, and libraries
    • High-voltage distribution systems on school campuses, underground and overhead
    ElectricalMechanicalClaims & Litigation
  • Commercial

    California

    Commercial & Office Building Disputes

    Office buildings, retail, restaurants, and tenant improvements

    Commercial disputes from high-rise chilled-water leaks to tenant improvement code violations — MEP performance, workmanship, and the cost to make it right.

    Role

    Designated expert and consultant — plaintiff and defense

    • Defense plumbing expert on a high-rise San Francisco office chilled-water leak
    • Defense MEP expert on a mid-rise San Francisco office buildout and zoning-use dispute
    • Restaurant and dental office matters involving HVAC performance, framing, and code compliance
    • Cost-of-repair analysis for tenant abandonment and restoration of office space
    MechanicalElectricalPlumbingClaims & LitigationCost & Damage Analysis
  • Multi-Family & Residential

    California

    Electrical Fire & Lightning Investigations

    Residential, commercial, and industrial structures

    Decades of electrical fire work — from lightning strike damages and electrical fire causes to aging apartment wiring and a major fire and explosion at a manufacturing facility.

    Role

    Cause evaluation expert — plaintiff, defense, and insurance

    • Investigation of wood-frame structural fires involving electrical systems and lightning
    • Forensic consulting on lightning strike damages and electrical fire causes
    • Plaintiff expert on cause and damages in a major fire and explosion at a San Jose manufacturing facility
    • Insurance claim advisor on a major San Francisco apartment complex fire involving 80-year-old wiring
    ElectricalFire ProtectionClaims & Litigation
Recent Litigation Activity

An active practice, year after year

Highlights from the CV's ten-year litigation history — plaintiff and defense work across MEPF systems, fire causes, cost of repair, and standard of care. Matters are described without identifying confidential parties.

2025

21 matters listed

  • Plaintiff expert, large San Rafael hotel — MEPF issues, $10M+ in claims
  • Defense expert, large Bay Area condominium project — MEP and photovoltaic systems, $4M+ in claims
  • Plaintiff expert, high-rise El Cerrito condominium — carbon monoxide and boiler exhaust issues
  • Advisor on insurance claim, major San Francisco apartment complex fire — 80-year-old wiring and scope of damages
  • Plaintiff expert, major fire and explosion at San Jose manufacturing facility

2024

11 matters listed

  • Defense MEP expert, twenty-story high-rise — 200+ condominiums and apartments
  • Defense expert for electrical contractor, two rebuilt Santa Rosa fire-damage homes
  • Plaintiff expert, Orinda home — fire sprinklers, MEP, cost overruns and back charges
  • Electrical consultant, San Francisco apartment lobby signage electrical fire

2023

16 matters listed

  • Defense fire sprinkler expert, San Jose shopping mall — $5M
  • Plaintiff GC and cost of repair expert, Napa custom home and property — $5M
  • Defense MEP expert, fire damage related to solar panel cleaning in San Bernardino — $400K
  • Plaintiff expert, PEX piping failure in Pacifica custom home

2022

17 matters listed

  • Defense expert, fire sprinkler installation in San Francisco high-rise residential
  • Plaintiff expert, $25M Tiburon custom home MEP defects
  • Defense expert, electrocution cases in Sonoma and at a state-owned building in Sacramento
  • Defense plumbing expert, high-rise San Francisco office chilled-water leak damages

The complete litigation history from 2016 forward is included in the downloadable Curriculum Vitae.

Field Photography

On-site inspections, in pictures

Photographs from the Coe & Company album — field inspections and testing, the building systems at the center of real disputes, and the facilities and forums where the work happens. All images open in an accessible, keyboard-navigable viewer.

On-Site Inspections

Field inspection work across rooftops, sites, and building systems — the first-hand observation that grounds every opinion.

Testing & Documentation

Water spray testing, destructive openings, and controlled evidence documentation that expose what finished surfaces conceal.

Mechanical, Plumbing & Building Systems

MEPF system evaluations — from hydronic piping and rooftop equipment to gas piping, drainage, and electrical conditions.

Notable Facilities & Project Environments

The kinds of places this practice has served — from international airports and national laboratories to cathedrals, campuses, and wine caves.

Buildings & Envelope Conditions

The facilities and envelope assemblies at the center of investigations — from custom residences and condominium communities to historic facades.

Litigation Settings

Where the work concludes — clear, defensible testimony delivered in deposition, arbitration, and trial.

Your Matter

Built for complex, high-stakes construction disputes

Submit a case for confidential review — no obligation, no disclosure of privileged details required at inquiry.